2007 - 2008 Transit Space Rates & Allotments
South Bend / Mishawaka
# Buses 1 period 3 periods 6 periods 13 periods
Production Rates
1 2-5 6-10 11-30 31+
Interior 11” x 28” 40 $487 $470 $454 $444 $60.00 $53.00 $45.00 $38.00 $30.00
20 238 228 216 206
10 125 114 103 93 11" x 28" SAV + Overlam Mounted on 20pt. C1S
Headlight 21" x 38"
Appears on front of bus.
40 1925 1828 1733 1636 $90.00 $68.00 $45.00 $38.00 $30.00
20 963 915 867 867
10 487 462 438 414 21" x 38" PSV (self adhesive) + UV
1 55 52 50 47
Taillight 21" x 70"
Appears on back of bus.
40 4337 4110 3878 3650 $90.00 $68.00 $53.00 $45.00 $30.00
20 2174 2055 1936 1828
10 1088 1028 968 915 21" x 70" PSV ( self adhesive) + UV
1 114 108 103 98
Queen 30" x 72"
Appears on curb side of bus.
40 5781 5554 5327 5094 $128.00 $90.00 $53.00 $45.00 $38.00
20 2893 2780 2660 2552
10 1449 1384 1330 1276 30" x 72" PSV ( self adhesive) + UV
1 146 141 136 130
King 30" x 144"
Appears on driver's side of bus.
40 7320 7003 6770 6534 $173.00 $113.00 $75.00 $60.00 $45.00
20 3612 3499 3386 3272
10 1807 1747 1693 1639 30" x 144" PSV ( self adhesive) + UV
1 184 179 173 168
Months Per Month Months Per Month
Full Wrap
Production and installation of one
wrap included.12 month warranty
12 $2,530 Access Bus
Production and installation of one wrap included.12 month warranty
12 $1,600
18 1,980 18 1,440
24 1,760 24 1,280

Production not included. All rates are per four-week period. Rates effective 09/01/07

Download a printer friendly version in PDF format. Requires Adobe Acrobat Reader.